WSDOT gets the Bridge Open!

Discussion in 'Fly Fishing Forum' started by Kelly Michelsen, Jun 20, 2013.

  1. Kelly Michelsen

    Kelly Michelsen Active Member

    Joined:
    Jul 9, 2010
    Messages:
    165
    Likes Received:
    38
    Location:
    Wenatchee, Washington
    I am Happy to say that my WSDOT fellow employees got the JOB done well and
    I think in a timely fashion. I hope you will maybe have a little more Respect for
    The worker's ' no agency is perfect but I think it was at least one positive kudo
    For a state agency that is not very well understood by those looking from the outside
    In.
    Kelly Michelsen
     
  2. Jim Speaker

    Jim Speaker Active Member

    Joined:
    Sep 21, 2005
    Messages:
    2,226
    Likes Received:
    530
    Location:
    Mill Creek, WA
    Home Page:
    That was pretty damn fast... Nice!
     
  3. JesseC

    JesseC Active Member

    Joined:
    May 12, 2009
    Messages:
    2,010
    Likes Received:
    988
    Location:
    seattle, wa
    You can put a new dress on a prostitute but she's still a whore.

    I hope you guys are allocated the budget required to maintain the basic services the government should be worried the most about.
     
  4. PT

    PT Physhicist

    Joined:
    Jan 11, 2003
    Messages:
    3,856
    Likes Received:
    1,015
    Location:
    Edmonds, WA
    Yep, congrats on a speedy reopening. On time and under budget because the focus was getting a road reopened. Seems most of our transportation projects are nothing more than jobs programs. Track record speaks for itself.

    In this case we saw what could happen when the focus was about getting vehicles moving again.
     
  5. PT

    PT Physhicist

    Joined:
    Jan 11, 2003
    Messages:
    3,856
    Likes Received:
    1,015
    Location:
    Edmonds, WA
    I know what the letters WSDOT stand for. Just wish the agency stood for those letters.
     
  6. Kelly Michelsen

    Kelly Michelsen Active Member

    Joined:
    Jul 9, 2010
    Messages:
    165
    Likes Received:
    38
    Location:
    Wenatchee, Washington
    I and most of the people involved with the work have nothing to do with budgets, I was congratulating
    my fellow workers not, Management or the New leadership within the Department.
    Its always frustrating to have people that have no idea what it takes to do the job. We are not
    PERFECT SHINNING EXAMPLE but I try to give people and groups the benefit of the doubt
    especially when I feel like there are know it alls that just don't know what they are talking about
    continue to spout off like we are all pigs at the trough.
    Kelly Michelsen
     
  7. JesseC

    JesseC Active Member

    Joined:
    May 12, 2009
    Messages:
    2,010
    Likes Received:
    988
    Location:
    seattle, wa

    Not criticizing you guys for doing the best you can with what you have. That said, infrastructure across the US is underfunded and in a state of disrepair because of budgetary malfeasance by politicians more interested in shiny social programs that'll get em re-elected.
     
    dryflylarry likes this.
  8. zen leecher aka bill w

    zen leecher aka bill w born to work, forced to fish

    Joined:
    May 6, 2008
    Messages:
    3,773
    Likes Received:
    1,350
    Location:
    Moses Lake, WA
    Two thumbs up to WSDOT.
     
  9. Kelly Michelsen

    Kelly Michelsen Active Member

    Joined:
    Jul 9, 2010
    Messages:
    165
    Likes Received:
    38
    Location:
    Wenatchee, Washington
    I agree that there is a lot of yada yada I I'll do this elect me
    It Is sad that we have career politicians on both sides Demos
    And Repubs mucking it up. Enough said.
    Kelly Michelsen
     
  10. Abomb

    Abomb Active Member

    Joined:
    Feb 19, 2008
    Messages:
    472
    Likes Received:
    73
    Location:
    In the skinny
    The work was in house and not farmed to a Contractor? Good deal.
     
  11. PT

    PT Physhicist

    Joined:
    Jan 11, 2003
    Messages:
    3,856
    Likes Received:
    1,015
    Location:
    Edmonds, WA
  12. Old Man

    Old Man Just an Old Man

    Joined:
    Jan 1, 2002
    Messages:
    24,400
    Likes Received:
    3,313
    Location:
    Dillon, Mt
    I was sitting here thinking about what bridge. Then it dawned on me, the I-5 bridge. I seem to be getting dumber and dumber.
     
  13. KerryS

    KerryS Ignored Member

    Joined:
    Oct 19, 2001
    Messages:
    7,367
    Likes Received:
    2,681
    Location:
    Sedro Woolley, WA, USA.
    I haven't been south of the river since that thing fell down. Nice job getting a temp in place. It will be cool to see how the permanent section is built and placed. I have some understanding of what it took to get this done. I worked for Wilder Construction Company for 12 years. We built many bridges around the state. There is nothing easy about building bridges. Let alone getting a repair in place in such a short time frame. Not a nice job, a great job.
     
  14. FT

    FT Active Member

    Joined:
    Mar 29, 2005
    Messages:
    1,287
    Likes Received:
    145
    Location:
    Burlington, WA
    WSDOT surprised me with how quickly they got this temporary span up and in service and how quickly the permanent replacement span is scheduled to be up and in use as well. KUDOS to all involved for doing so!

    Now if only most bridge replacements (or hwy repaving) could be accomplished as this one was without the ad naseum studies/reviews that take a year or more before any work can be done. I mean why does there need to be a study that includes economic impacts for repaving a section of road that needs it? And since repaving an existing road would have minimal ecological impacts, why is it necessary to do a study on the impacts before work can begin to repave the road?

    Let us not forget that if the Governor had not declared a "State of Emergency" for the bridge, that there would have been an environmental review before the pieces of the downed section could have been removed from the river, the temporary span designed, the temporary span put in place, the permanent replacement designed, and the permanent replacement put in place. Even the newspapers mentioned since there was a "state of emergency" declared by the governor, work was allowed to proceed very quickly without all the reviews and resultant delays the reviews create.

    In my opinion, repaving and bridge replacement ought be able to proceed with minimal to no new impact studies and reviews. Afterall, the road or bridge already exists and its impacts have been existent for as long as it has been in place, so why the need for a new and extensive review to repair or replace that which already exists? Oh yeah, I forgot, they are needed because it creates jobs and helps protect everyone from an improved road.
     
  15. KerryS

    KerryS Ignored Member

    Joined:
    Oct 19, 2001
    Messages:
    7,367
    Likes Received:
    2,681
    Location:
    Sedro Woolley, WA, USA.
    There are some things that need to be done even for repaving projects. I have been out of the business for awhile but even some repaving projects now require that every drop of water that falls on that road needs to be accounted for. Which usually means creating a drainage plan of some sort and possibly building retention ponds and bio swales or some other means of treating the water. Most of this is done to protect water quality of the very water the fish you like to fish for live in. A large portion of water pollution comes from the roads you drive on.
     
    Gary Knowels likes this.